Construction of 10km long Pre-Stressed Concrete Circular Conduit 3250mm dia from Muradnagar to Hindon River (0-12.5Km) and 270 Cusec Raw Water
pipeline Project at Muradnagar, Ghaziabad (UP) for Delhi Jai Board. The work involves excavation of 7 lac Cum 4 to 8m deep and 39000 Cum of concreting work.
Indian Institute of Technology, Delhi
Construction of 6.2 Km long D-shaped tunnels with a cross-selection of 32sq.mtrs. 180feet below ground for irrigation purposes for take off from konar reservoir in Hazaribag district, Bihar during 1981-89.
The work involves excavation in rock of 2.5 lac Cum at 90- 110 feet below ground level.
Ministry of Irrigation, Govt. of Bihar,INDIA
Sewage treatment Plant & laying of Sewer Net Work for Kathmandu, Nepal(World Bank Aided Project). The work was executed during 1977- 1981.
Engineering Science Inc.(USA)
Sewage treatment Plant for the city of Al-Najaf in Iraq of the Ministry of Housing, Govt. of Iraq. The work was executed during 1980-85.
Designed and Executed by BBL as per British Standard
The Biggest Hopper Based Settling Tank (Clarifiers) to treat 100 Million Gallon of water everyday along with Pumping Station and Pipeline for treated water for Bombay Muncipal Corporation (A World Bank Aided Project) during 1976-79.
M/s. Binnie and Partner (UK)
RCC Circular 10MLD Demineralisation Plant alongside with Filter and Built in Aerator for 2 X 500MW Power Plant in Talcher, Orissa.
For NTPC